twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
arm
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2024. .
KARABAKH
A+
A-

Azerbaijan digs 5 km of tunnel under Murovdagh VIDEO

11 April 2023 17:52

Spokesman for the State Agency of Azerbaijan Automobile Roads Anar Najafli has said that a tunnel under the Murovdagh Mountain, part of the Tonaggali-Kalbajar-Istisu road, is being actively laid.

“The construction of this 23.4-km tunnel will ensure year-round and uninterrupted traffic on the road,” Najafli told Caliber.Az.

At the moment, 5 km of tunnels have already been dug in both directions. Along with fixing the arches of the tunnel, a road to the entrance to the tunnel is being laid. Numerous pieces of equipment have been brought to the construction site.

In total, four tunnels are being laid on the road. Three of them are almost ready - they have been dug, the vaults have been already concreted, and the final work is underway.

Moreover, 40 per cent of the Khudafarin-Gubadli-Lachin road has been built.

The Murovdagh Mountains are the highest mountain range in the Lesser Caucasus. The range is about 70 km long (43 miles), with its highest peak at 3,724 m (12,218 feet).

Following the first Karabakh war, the mountain ridge formed the northern part of the line of contact separating the self-proclaimed "Karabakh republic" from Azerbaijan. Its southern slopes ran through the Aghdara district of Karabakh. In late 1993–early 1994, the ridge was the scene of the bloodiest battle of the first Karabakh war. During the 2020 war, Azerbaijan regained control over the peak of Murovdagh.

Тимур Рзаев

Caliber.Az
Views: 355

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
instagram
Follow us on Instagram
Follow us on Instagram
KARABAKH
News about KArabakh and the processes that are related to this topic