twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2026. .
WORLD
A+
A-

Equipment fault prompts output cut at Hungary’s Paks nuclear plant

20 September 2026 13:20

The power output of Unit 2 at Hungary’s Paks Nuclear Power Plant has been reduced by 150 MW due to a malfunction in mechanical equipment, according to the plant’s official website.

The reduction occurred on the morning of September 20. With the unit’s normal output at around 2,000 MW, its capacity was lowered by 150 MW.

Specialists are working to fix the malfunction.

By Jeyhun Aghazada

Caliber.Az
Views: 54

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
telegram
Follow us on Telegram
Follow us on Telegram
WORLD
The most important world news
loading