twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
arm
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2025. .
KARABAKH
A+
A-

Azerbaijan restores energy infrastructure in Kalbajar, Lachin VIDEO

10 January 2024 16:21

Azerishig OJSC continues restoration work in all liberated territories, including Kalbajar and Lachin.

The construction of a new substation with a capacity of 35/0.4 kW and a Control Center is underway at an accelerated pace in the city of Kalbajar, and a substation with a capacity of 110/35 kW is being built in the territory of Istisu, Caliber.Az reports, citing the company

A lot of work has also been done in the Lachin region. The construction of underground lines continues in the city of Lachin.

In general, as a result of the work, a ring power supply scheme will be created connecting the power grids of Kalbajar and Lachin regions.

Caliber.Az
Views: 348

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
ads
KARABAKH
News about KArabakh and the processes that are related to this topic
loading