twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2026. .
KARABAKH
A+
A-

Azerbaijan restores energy infrastructure in Kalbajar, Lachin VIDEO

10 January 2024 16:21

Azerishig OJSC continues restoration work in all liberated territories, including Kalbajar and Lachin.

The construction of a new substation with a capacity of 35/0.4 kW and a Control Center is underway at an accelerated pace in the city of Kalbajar, and a substation with a capacity of 110/35 kW is being built in the territory of Istisu, Caliber.Az reports, citing the company

A lot of work has also been done in the Lachin region. The construction of underground lines continues in the city of Lachin.

In general, as a result of the work, a ring power supply scheme will be created connecting the power grids of Kalbajar and Lachin regions.

Caliber.Az
Views: 772

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
instagram
Follow us on Instagram
Follow us on Instagram
KARABAKH
News about KArabakh and the processes that are related to this topic
loading