twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
arm
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2025. .
KARABAKH
A+
A-

Azerbaijan's Zangezur Corridor main road 95% finished, state agency says PHOTO

16 September 2025 12:19

Construction of the Horadiz–Jabrayil–Zangilan–Aghband road in Azerbaijan, part of the Zangezur Corridor, has reached 95% completion, as per the statement by the State Agency of Azerbaijan Automobile Roads. 

The agency says the main road spans 123.6 km, Caliber.Az reports.

According to the agency's statement, the Zangezur Corridor project is being implemented in line with modern standards and high-quality requirements. The total length of the project is 149.9 km.

The road is designed as a 1B technical category, allowing for high-speed and safe travel. Key parameters include:

  • Road width: 14–21 metres

  • Roadbed width: 21.5–29.5 metres

  • Number of lanes: 4–6

These specifications are intended to ensure comfortable and unobstructed traffic flow along the corridor.

By Khagan Isayev

Caliber.Az
Views: 100

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
ads
instagram
Follow us on Instagram
Follow us on Instagram
KARABAKH
News about KArabakh and the processes that are related to this topic
loading