ECONOMICS
A+
A-
ACWA Power to expedite wind farm construction in Azerbaijan
29 February 2024 20:35
Azerbaijan and Saudi Arabia's ACWA Power have come to an agreement to expedite the development of the 240 MW Khizi-Absheron wind farm.
Energy Minister Parviz Shahbazov shared the news on Twitter after meeting with ACWA Power's chairman Mohammad Abunayyan, Report says.
Shahbazov emphasized that this project signifies a significant collaboration between Azerbaijan and Saudi Arabia in the realm of energy transition.
We agreed to accelerate the realization of the 240 MW Khizi-Absheron WPP with the delegation led by Mohammad Abunayyan, the Chairman of the Board of Directors of @ACWAPower. This project will be the first major contribution of Azerbaijan and Saudi Arabia to the #EnergyTransition. pic.twitter.com/yduq3QJAm7
— Parviz Shahbazov (@ParvizShahbazov) February 29, 2024
Caliber.Az
Views: 212