twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
arm
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2025. .
SOCIETY
A+
A-

Azerbaijan building Toganaly-Kalbajar-Istisu road, Murovdag tunnel PHOTO

21 September 2022 18:43

The Toganaly-Kalbajar-Istisu highway stretching 82 kilometres is one of the important road infrastructure projects which is implemented in the Karabakh and East Zangazur economic regions.

The length of the Toganaly-Kalbajar section is 56 kilometres, Kalbajar-Istisu - 26 kilometres. The construction of the Murovdag tunnel is underway on the 16-kilometer section of the Toganaly-Kalbajar road, Report informs.

The two-lane tunnel will be 11,600 metres long and 12 metres wide. Three additional tunnels stretching 561.2 metres, 605.1 metres and 888 metres are also under construction.

The Toganaly-Kalbajar, Kalbajar-Istisu roads will have two and four lanes in accordance with the first and second technical categories upon the president’s instructions.

Caliber.Az
Views: 206

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
ads
instagram
Follow us on Instagram
Follow us on Instagram
SOCIETY
The most important and social news of Azerbaijan
loading