twitter
youtube
instagram
facebook
telegram
apple store
play market
night_theme
ru
arm
search
WHAT ARE YOU LOOKING FOR ?






Any use of materials is allowed only if there is a hyperlink to Caliber.az
Caliber.az © 2025. .
KARABAKH
A+
A-

Azerbaijan installs 11 hydroelectric stations in liberated lands

22 February 2023 19:53

Starting from 2021, 11 automatic hydrological stations have been installed on 10 rivers in the liberated territories.

These stations have been operating since 2022, Ragub Miriyev, Chief of Staff of the Ministry of Ecology and Natural Resources, told Report.

According to him, the main purpose of these stations is to measure water flow in rivers, the level and quality of water, and its temperature.

“The data is sent to our National Department of Hydrometeorology and analysed there. It should be noted that all these stations are of a new type, meeting modern standards. Along with automatic hydrological stations, radioecological stations have been installed here, which transmit data on the level of radiation,” he stressed

Caliber.Az
Views: 74

share-lineLiked the story? Share it on social media!
print
copy link
Ссылка скопирована
ads
telegram
Follow us on Telegram
Follow us on Telegram
KARABAKH
News about KArabakh and the processes that are related to this topic
loading